Project description
Together with Aan de Stegge (Civil and Mechanical), the Sewage Plant is renovated and the hydraulic capacity extended from 2.550 m3/h to 3.050 m3/h. The rebuilding is carried out is two phases. During the first phase the complete mechanical and electrical installations are replaced, plus new buildings for the headworks, two return sludge pumping stations and a combined blower/energy building. The existing Aeration basins renovated and modified. Beenen is responsible for the complete electrical and control installations. During phase two, in about ten years time, the aeration basins will be replaced by new basins. The point of departure is that civil structure built during phase 1, are also usable in phase 2.
Scope of supply
The following solutions and services are delivered by Beenen: